Cookie settings

Choose what this browser shares on golain.io. We remember your decision for 180 days. Rejecting optional tracking does not stop you browsing or contacting us.

Read about providers, storage and your rights

What would you like to improve?

Leave your email for an expert’s response. Choose a topic or add details if you like — no meeting required.

Work and personal email addresses are both welcome.

Add optional details

We use these details to respond to this request. Privacy policy. Optional cookies are not required.

Prefer to talk? +91 986 001 9933 · Email us directly

AI-PRE · RELIABILITY ENGINEERING FOR EVERY SHIFT

Run everylike

Know why the line is losing time, what needs attention, and what your team should do next. Golain turns machine data into clear, checkable actions before a small problem becomes a stopped line.

CLIENTS / DELIVERY PARTNERS

The teams we build with.

Midera
BorgWarner
Spark Minda
CaneBOT
Mind-a-Mend
Enough Energy
Kikobot
ERIC Robotics
OmniWOT
Mekosha Technologies
SBFC
Zype
IWBDC Consulting
Renu
Midera
BorgWarner
Spark Minda
CaneBOT
Mind-a-Mend
Enough Energy
Kikobot
ERIC Robotics
OmniWOT
Mekosha Technologies
SBFC
Zype
IWBDC Consulting
Renu
INDUSTRY CONTEXT / INDEPENDENT RESEARCH

These figures illustrate the scale of the manufacturing problem. They are not Golain performance claims.

FROM LINE PROBLEM TO VERIFIED FIX

See what happened.

Know what to do next.

Golain gives maintenance and operations one traceable path from the first signal to the confirmed repair.

01

A problem appears

A line stops, drifts or loses speed.

02

The evidence comes together

Golain links the alarms, PLC logic, live signals and maintenance history.

03

The team gets a next step

See the likely cause, supporting evidence and what to check next.

04

The fix becomes reusable

The verified repair stays with the line for the next shift.

WHAT YOUR TEAM SEES

Start at the plant.

Drill down to the cause.

Move from plant totals to a line, a stop and the machine evidence behind it. Each role sees the detail it needs without waiting for a custom report.

OEE, availability and performance against target, with every loss ranked by the minutes it actually cost.
Plant overviewSHIFT · ALL LINES
Golain Plant overview screen, full size

OEE, availability and performance against target, with every loss ranked by the minutes it actually cost.

GOLAIN RESULTS / INDIVIDUAL DEPLOYMENTS

What teams measured on their own lines.

These are individual deployment results, not expected or guaranteed outcomes. Performance depends on the line, data, operating practice and starting baseline.

OBSERVED RESULT
+5%
higher OEE
Tier-1 automotive components line
OBSERVED RESULT
−42%
less unplanned downtime
Powertrain and heavy-engineering line · against its own pre-deployment baseline
OBSERVED RESULT
6×
faster troubleshooting
Equipment OEM service operation · measured per incident
Source: Golain case-study records. Compare the scope and baseline before applying a result to another plant.Review the deployment evidence →
START WITH A LINE YOU KNOW

Bring us one line.

Put one costly loss on the table.
30 MINUTES · NO PITCH DECK

Bring the line, the KPI and the failure your team keeps seeing. In 30 minutes, we will tell you what evidence we need and whether a four-week start is worth pursuing.