Run More Variants

Without Adding More Variation.

High-mix lines carry more recipes, component lots, setup checks and test paths. Golain connects the active variant with station settings, quality results and cycle times so teams can reduce setup variation and find defects closer to their source.

SMTAOIFinal testFinal assemblyComponent lots

LOSS → PRACTICAL CAPABILITY

Start With The Loss You Need To Reduce.

Each capability can begin with one operating problem and one measurable baseline. Expand only after the plant verifies the result.

LOSS · CHANGEOVER
Changeover Churn

Manual entry, station by station, every SKU.

MEASURE ON YOUR LINE · time to first good unit
Recipe & Changeover Orchestration

Approved variant settings are delivered consistently and operators verify the line before the first production unit runs.

LOSS · DEFECT ESCAPE
Defects That Pass AOI

Found at functional test, or by the customer.

MEASURE ON YOUR LINE · yield, scrap or defect escape
Process SPC With Physics Bounds

Placement force, solder profile and test margins are scored against process physics, not only a control chart.

LOSS · TEST QUEUE
Test-Station Bottlenecks

The constraint is a spreadsheet filled in after the shift.

MEASURE ON YOUR LINE · the plant's agreed operating baseline
Constraint Analytics

Station cycle and queue times are measured continuously, so the constraint gets named rather than argued about.

LOSS · RECALL
Traceability Under Recall

Scoped by date range instead of by fact.

MEASURE ON YOUR LINE · the plant's agreed operating baseline
Unit-Level Genealogy

Every unit carries its component lots, stations and test results. Scope a recall by query.

The useful target comes from this plant's baseline. These capabilities describe what to investigate and measure, not a forecast for the industry.

START WITH ONE LINE

Start With One Operating Loss.

Bring the current baseline and the workflow around it. We will map the available evidence and the smallest useful result to prove.

WHAT YOU GET ON THE CALL
We reply within one business day.
You talk to an engineer, not a rep.
Bring a line diagram if you have one.