When setup depends on memory and manual parameter entry, changeover time varies by operator and the first good part becomes the test. Golain helps teams standardise the recipe, verify the setup and measure the real line constraint.
WHAT TO MEASURE FIRST
Measure setup duration, first-off scrap and station timing by product and shift before setting a reduction target.
SET THE SITE BASELINE BEFORE MAKING AN IMPROVEMENT CLAIM
WHAT CHANGES FOR THE TEAM
HOW IT WORKS
Send controlled parameters to the relevant stations and keep the operator's confirmation in the workflow.
Check required conditions before the first production part becomes the inspection method.
Use actual station and queue times to show where line balance is limiting throughput.
WORKED EXAMPLE
A consistent changeover keeps the approved recipe, operator checks and actual station timing in one workflow.
START WITH ONE PROBLEM
Bring the current workflow and baseline. We will map the evidence needed, the people involved and the smallest useful result to prove.