Most plants can calculate OEE. The harder question is where the lost time actually went. Golain connects each stop and speed loss to the responsible asset, hour and operating condition so the team knows what to improve.
WHAT TO MEASURE FIRST
Establish where availability and speed losses occur by asset, hour and cause before setting an improvement target.
SET THE SITE BASELINE BEFORE MAKING AN IMPROVEMENT CLAIM
WHAT CHANGES FOR THE TEAM
HOW IT WORKS
Use machine events to show where the lost minutes occurred instead of asking the shift to categorise them later.
Bring small recurring events together so the team can see when one pattern is creating a material production loss.
Use a strong hour the line has already achieved as a practical reference for the current shift.
WORKED EXAMPLE
A shift can report acceptable availability while repeated short stops still remove meaningful production time.
START WITH ONE PROBLEM
Bring the current workflow and baseline. We will map the evidence needed, the people involved and the smallest useful result to prove.