Find The Problem

Before The Line Stops.

Golain watches how critical equipment behaves and shows your reliability team when the evidence points to a developing failure. The team can review the finding, plan the work and use an existing maintenance window when time allows.

INDIVIDUAL DEPLOYMENT RESULT

−42%

In one documented deployment, unplanned downtime fell against that line’s own pre-deployment baseline after the team began reviewing developing equipment problems earlier.

SOURCE · GOLAIN CASE-STUDY RECORD · RESULTS VARY BY BASELINE

WHAT CHANGES FOR THE TEAM

Same Machine. Same Bearing. Different Week.

TODAY

The stop comes first.

  • The machine stops. Then somebody is told.
  • Diagnosis starts at the machine, from scratch, at 2am.
  • Parts are found, not reserved. Purchasing starts after the stop.
MTTR MEASURED IN SHIFTS
WITH GOLAIN

The team has time and evidence.

  • A developing problem is surfaced with operating margin.
  • The finding shows the likely issue and supporting signals.
  • The team reviews the evidence before approving work.
MTTR 42 MIN · 0 STOPS

HOW IT WORKS

Three Practical Changes.

Compare live behaviour with the expected range

Use operating history and equipment limits to identify changes that have a plausible path to failure.

Give the team evidence to review

Show the affected signals, likely issue, confidence and available time instead of sending an unexplained alert.

Plan and verify the response

Turn an approved finding into prepared maintenance work and record what the technician actually found.

WORKED EXAMPLE

One Incident, Timed To The Hour.

Industrial bakery, Oven Zone 3. The same WO-48213 on the PdM page, from the floor's point of view.

TIMELINE · ONE INCIDENT · WO-4821337 HOURS
T−36hVibration on Oven Zone 3 moves beyond the expected operating rangeFINDING · CONF 0.92
T−35hThe reliability team reviews the evidence and confirms a bearing inspectionTEAM REVIEW
T−34hWO-48213 is approved and bearing B-3102 is reserved from site stockMAINTENANCE PLANNING
T−2hThe next changeover window opens with a qualified technician scheduledSCHEDULER
T+0Bearing B-3102 is replaced in 42 minutes inside the planned windowFIELD SERVICE
T+1hThe verified finding and repair are added to the asset recordASSET HISTORY
Result: the team completed the repair during planned downtime and protected an oven run valued at $18,000.

START WITH ONE CRITICAL ASSET

Start With The Stop That Costs Most.

Bring the line or asset that costs the most when it fails. We will map the available evidence and the first warning worth proving.

WHAT YOU GET ON THE CALL
We reply within one business day.
You talk to an engineer, not a rep.
Bring a line diagram if you have one.